top of page

P2:PRECEDENT STUDY

P4 - LENORA HOTEL / RDMA

BANDUNG, INDONESIA

16   /   07   /   2020

The project is a network of an on-going hotel construction from the previous design that actually has already in topping off position. Basically the client wanted to recompose the almost finish facade to seamlessly connect all the seemingly undesired result, such as the very obvious four balconies exposed from the main road, and tackle groups of air-con machine stick to the perimeter wall exposed from the side road.

​

​

​

​

For more information can refer to: https://www.archdaily.com/938964/lenora-hotel-rdma

bottom of page